Design and Migrate
Cloud Solution Design
Before a single workload moves, you get a written picture of what you run today, what it should look like on Azure, what it will cost to operate and in what order it should happen. No work begins on a verbal estimate.
What this includes
Current-state assessment
An inventory of the servers, applications, files and dependencies you actually rely on — including the ones nobody documented.
Target environment design
A documented Azure design covering subscriptions, networking, identity, storage and backup, sized to your organization rather than to an enterprise template.
Landing zone setup
The governed foundation your workloads land in: naming, tagging, policy, role assignments and cost boundaries, set once and set correctly.
Well-Architected review
Your existing environment measured against Microsoft's reliability, security, cost, operations and performance pillars, with every gap ranked.
Cost modelling and licensing review
What the target environment costs each month, which reserved and benefit options apply, and where current spend is going to waste.
Migration roadmap
Sequence, dependencies, cutover windows and rollback points, agreed in writing before any work starts.
Technologies and standards
Related areas
- Cloud Migration and ModernizationA staged move off aging servers, with a rollback point at every step.7 services
- Cloud-Native DevelopmentCustom applications built to run on managed cloud services from day one.9 services
- Automation and IntegrationServerless workflows that take the manual steps out from between systems.6 services
Not sure which of these you need?
Most organizations are not, at the start. Describe what is not working today and we will tell you which of these areas it actually falls into — including when the answer is that you do not need us.
Start a conversation